2020 City of Waukesha Spot Sealing

Project Update: August 12, 2020


Beginning tomorrow (8/13) the City’s contractor for the 2020 Spot Sealing contract will be beginning their work in the Springbrook/Penhurst/Rempe neighborhood. The purpose of the contract is to fill and smooth out the deep transverse cracks that develop over time with asphalt roads. The contractor will be blowing asphalt chips into the cracks, after the material has set we will be through with a street sweeper to pick up any chips that are loose. Attached is a map showing the streets we plan on spot sealing. The contractor should be finished before the end of the week/early the following week (weather dependent).

 

If you have any questions, please contact me at your convenience.

 

 

Craig Ausen, P.E.

Project Engineer

City of Waukesha – Engineering Division

130 Delafield St. Waukesha, WI 53188

O: (262) 524-3589

C: (262) 349-6516

2020 Spot Sealing-Area 2