Fire Station No 4 Sprinkler and Fire Alarm Upgrade

Project Update: July 2, 2020

This Project includes the following work:

  • Installing a new 6-inch water lateral to replace the existing 2-inch water lateral
  • Installing a new automatic fire alarm system with 24-hour monitoring
  • Installing a new fire sprinkler system

Work Completed this week

  • Blair Fire Protection has continued their work of installing a fire sprinkler system.
  • Plumber on site this week to switch the water to the new water lateral.

Anticipated work next week

Blair to continue their sprinkler installation